MMA Portfolio | Industrial projects | Pruett Drill Site |
Pruett Drill Site 3
Project Description: The Pruett Drill Site is 5 acre natural gas well drilling and production site located in south Arlington. MMA’s engineering group designed a 10” water service connection to provide adequate water flows for Chesapeake’s fracing operations.
| Camera Maker: | Eastman Kodak Company |
| Camera Model: | KODAK Z740 ZOOM DIGITAL CAMERA |
| Shutter Speed: | 1/750 sec |
| Aperture: | f/4 |
| Focal Length: | 6.3 mm |
| ISO Sensitivity: | 321257552 |
| Time Taken: | 2008:12:27 13:11:57 |
| Exposure Compensation: | 0 EV |
| Metering Mode: | Unknown: 574816261 |
| Flash Fired: | Unknown: 758775832 |
| Latitude: | |
| Latitude Reference: | |
| Longitude: | |
| Longitude Reference: | |
| Altitude: | |
| Altitude Reference: |

